Toodyay Aquatic Centre

  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre
  • Toodyay Aquatic Centre

Commercial Aquatics were engaged to complete the aquatic works as part of the greater Toodyay Sport and Recreation Precinct. The pools comprise a co-joined 25m lap and beach entry leisure pool. The pools were constructed in double form concrete and fully tiled. The Leisure pool contains beach entry jets, features, and a seated hydro jet area. The construction of the concrete balance and backwash tank was also included. The filtration system comprises dual pumping system, horizontal sand filtration units, granular chlorine disinfection with a secondary ultraviolet unit system. Liquid acid is used for pH correction and a Poly aluminium chloride coagulant system was also installed.

Client: ADCO Constructions

Location: Toodyay, WA

Completed date: 2020

Category: Aquatic Centres

Share: