Commercial Aquatics were engaged to complete all the pool and water feature elements at the new five-star Westin Hotel, including a level four 20m x 5.8m infinity edge pool, level four 12m long water wall for the wellness centre and water features located on ground level.
The pool scope of works included concrete structure, spring isolation, waterproofing, finishes, hydraulics and a split level plantroom with salt chlorination and heat pump. A modular balance tank was utilised to make use of limited access and space. The water wall scope of works included custom stainless steel water blade mani-folds, hydraulics, and filtration system.
The ground level water features scope of works included balanced hydraulics to multiple ponds and a common filtration system.
Client: BPI (BGC & Posco J/V)
Location: Perth, WA
Completed date: 2018
Category: Hotels & Resorts