Located in the heart of Perth, Double Tree Hilton Northbridge provides guests with a fantastic central location to stay.
Commercial Aquatics Australia are proud to have completed the finishes, furniture, hydraulics and pool filtration for the 12.1m long x 3.4m wide pool on the hotel’s third level.
The pool structure was integrated as part of a new structural transfer slab on the existing building. All pool hydraulic fittings and pipe penetrations were cast in the structural elements. The pool structure was waterproofed and finished in full tiles. The pool plant was installed comprising cartridge filtration, liquid chlorine and acid disinfection system. A heat exchanger was installed with the heat source off the primary building heating system.
Client: SKS Group
Location: Northbridge, WA
Completed date: 2019
Category: Hotels & Resorts