Commercial Aquatics were engaged to complete the pool hydraulic and filtration systems for the school’s new aquatic centre containing an indoor 51.5m x 20m pool with movable floor and boom. The hydraulics works comprised all soiled water return lines to the balance tank, return lines to the pool and pool perimeter ag drainage lines.
The filtration system comprises vertical sand filtration units, triple pump and strainer setup, dual granular chlorine, and carbon dioxide disinfection with secondary ultraviolet system.
We also provided the pool heating system which comprised of a titanium plate heat exchanger with primary and secondary sides and full control with the heat source by others. The complete system is controlled with an HMI switchboard.
Client: ADCO
Location: East St Kilda, VIC
Completed date: 2019
Category: Schools