Commercial Aquatics were engaged to complete the pool hydraulic and filtration systems for a new sports pavilion & aquatic centre containing outdoor 50m, Learn to Swim & children’s Leisure play pools, as well as two slides.
The hydraulics works comprised all soiled water, return lines, pool perimeter ag drainage lines inclusive of all excavation & backfill. The filtration system comprises ultra fine filtration units, stainless steel pumps and liquid chlorine and carbon dioxide disinfection, with secondary ultraviolet systems. We also provided the complete pool heating system which comprised of primary and secondary systems with non-condensing boilers and titanium plate heat exchangers. The complete system is controlled with multiple HMI switchboards located in the main plant and slide tower, with a satellite touch screen in the pool office.
Client: Hutchinson Builders
Location: Oak Park, VIC
Completed date: 2018
Category: Aquatic Centres