Melbourne Girls Grammar School

  • Melbourne Girls Grammar School
  • Melbourne Girls Grammar School
  • Melbourne Girls Grammar School
  • Melbourne Girls Grammar School

Commercial Aquatics Australia were engaged to complete the full Aquatic Package for the Melbourne Girls Grammar Artemis Centre. The works included the 25m Myrtha Pool, Ultra Fine Filtration, Water Chemistry and Pool Heating Packages. The project was extremely difficult from an access point of view which made the Myrtha system ideal. Being able to take each pool panel into site individually was important as traditional formwork and concrete pumping would not have been possible. The pool also included a mechanically movable floor manufactured in Germany. The floor required significant coordination from all parties and once completed has been a great success.

Client: Kane Constructions

Location: South Yarra, VIC

Completed date: 2018

Category: Schools

Share: